The following data is available relating to cost and activity:Using the High/Low method, calculate the variable cost per unit.Question 11Answera.1.82b.1.88c.2.50d.2.00
Question
The following data is available relating to cost and activity:Using the High/Low method, calculate the variable cost per unit.Question 11Answera.1.82b.1.88c.2.50d.2.00
Solution
I'm sorry, but I can't provide the help you're looking for without the necessary data. The high/low method requires two pairs of data: the highest and lowest levels of activity and the total costs at each level. Once you have this data, you can calculate the variable cost per unit by subtracting the total cost at the lowest level of activity from the total cost at the highest level, and then dividing by the difference in activity levels.
Similar Questions
The following data pertain to activity and utilities costs for two recent years: Year 2 Year 1Activity Level in Units 12,000 8,000Utilities Cost $15,000 $12,000Using the high-low method, what is the variable cost per unit for utilities?Multiple Choice$1.25 per unit.$1.50 per unit.$1.33 per unit.$0.75 per unit.
THIS QUESTION CONSISTS OF TWO SEPARATE QUESTIONS, BOTH OF WHICH MUST BE ANSWEREDPart AMapholoba Pty Ltd ’s activity for the last six months is as follows:MonthMachine hoursElectrical costsJanuary2 000R15 600February2 600R22 500March2 400R17 500April1 900R15 200May1 800R14 500June2 200?Required:Using the high-low method calculate the following and choose the correct answer from the options provided:Variable cost per unit Blank 1Fixed cost Blank 2The estimated electrical cost of 2 200 machine hours Blank 3 .Part BConsider the information provided in the following two (2) independent cases A and B. Assuming that overhead costs are absorbed to production work at the rate of R7,20 per direct labour hour, calculate the missing values and choose the correct answer from the options provided.CaseDirect labour hoursAbsorbed overheadsActual overheadsOver /under-absorbed overheadsA10 000Blank 4R75 600Blank 5B12 000Blank 6Blank 7R1 800 over absorbed
Dukes Carriages is a delivery company which uses trucks. The company’s cost accountant has determined that if one of their trucks drives 115 000 km during a year, the semi variable operating cost is R 17 per km. If the same truck only drives 75 000 km during the year, the average semi-variable operating cost increases to R 20 per km. What would the total fixed cost per km equate to, when using the high-low method?Group of answer choicesA. R 646 875B. R 1 500 000C. R 1 955 000D. R 954 773
The business is manufacturing 450 units. The cost of manufacturing per unit is Rs. 3.75, making the total variable cost Rs. 1688. Use a one-way data table to analyze the impact of change in per unit manufacturing cost on the total cost.______ is the total cost when the selling price is Rs. 5.5.Options :875247522503150
Multiple Choice QuestionWhen using the high-low method, the slope represents:Multiple choice question.total fixed coststhe variable cost per unitthe fixed cost per unittotal variable costs