Choose the correct option from those given below.A cassette recorder company uses four major components that are arranged below.  The components can be arranged from three different vendors, who have supplied reliability data that is presented in the table given below. Vendor Component A Component B Component C Component DVendor 1 0.94 0.86 0.90 0.93Vendor 2 0.85 0.88 0.93 0.95Vendor 3 0.92 0.90 0.95 0.90If the company decides to purchase all four components from only one vendor, then which vendor should be selected?Vendor 3Vendor 1Vendor 2Anyone between vendor 2 and vendor 3

Question

Choose the correct option from those given below.A cassette recorder company uses four major components that are arranged below.  The components can be arranged from three different vendors, who have supplied reliability data that is presented in the table given below. Vendor Component A Component B Component C Component DVendor 1 0.94 0.86 0.90 0.93Vendor 2 0.85 0.88 0.93 0.95Vendor 3 0.92 0.90 0.95 0.90If the company decides to purchase all four components from only one vendor, then which vendor should be selected?Vendor 3Vendor 1Vendor 2Anyone between vendor 2 and vendor 3

...expand
🧐 Not the exact question you are looking for?Go ask a question

Solution

To answer this question, we need to calculate the total reliability for each vendor. The total reliability is the product of the reliability of each component.

For Vendor 1, the total reliability is 0.94 * 0.86 * 0.90 * 0.93 = 0.693.

For Vendor 2, the total reliability is 0.85 * 0.88 * 0.93 * 0.95 = 0.675.

For Vendor 3, the total reliability is 0.92 * 0.90 * 0.95 * 0.90 = 0.708.

Therefore, the company should select Vendor 3 because it has the highest total reliability.

This problem has been solved

Similar Questions

Three vendors were asked to supply a very high precision component. The respective probabilities or their meeting the strict design specifications are 0.8, 0.7 and 0.5. Each vendor supplies one component the probability that out of total three components supplied by the vendors, at least one will meet the design specification is::

Multiple Choice QuestionTo obtain ISO 9000 certification, an independent _____ must verify that a business's factory, laboratory, or office meets quality standards.Multiple choice question.auditorpanelscientisteconomist

Multiple Choice QuestionRefer to Figure 16.1. Which one of these choices represents the highest risk for a business?Multiple choice question.Add to a product lineBuy new equipmentExpand into a new marketRepair existing equipment

A user is a consultant who is hired to prepare a report to Congress as to which industries should be required to maintain five nine availability. Which three industries should the user include in a report? (Choose three.)Select one or more:educationretailfinancepublic safetyfood servicehealthcare

The sequence of suppliers that contribute to creating and delivering a product is known as the ______.Multiple choice question.supply chainbalanced scorecardtactical controldashboard