A can complete a work in 50 days, B in 60 days and C in 100 days. A and B start the work together and leave after 15 days. How long will it take for C to complete the remaining work?Question 2Answera.45 daysb.40 daysc.50 days d.43 days
Question
A can complete a work in 50 days, B in 60 days and C in 100 days. A and B start the work together and leave after 15 days. How long will it take for C to complete the remaining work?Question 2Answera.45 daysb.40 daysc.50 days d.43 days
Solution
Let's solve this step by step:
Step 1: Find out how much work A, B, and C can do in a day. A can complete the work in 50 days, so A can do 1/50 of the work in a day. Similarly, B can do 1/60 of the work in a day, and C can do 1/100 of the work in a day.
Step 2: Find out how much work A and B can do together in a day. A and B together can do (1/50 + 1/60) = 11/300 of the work in a day.
Step 3: Find out how much work A and B have done in 15 days. In 15 days, A and B together have done 15 * (11/300) = 11/20 of the work.
Step 4: Find out how much work is remaining. The remaining work is 1 - 11/20 = 9/20 of the work.
Step 5: Find out how long it will take for C to complete the remaining work. C can do 1/100 of the work in a day, so it will take C (9/20) / (1/100) = 45 days to complete the remaining work.
So, the answer is a. 45 days.
Similar Questions
Select the correct answerA, B, C can do a work in 5 days, 10 days and 15 days respectively. They started together to do the work but after 2 days A and B left. C did the remaining work in how many days?Options3 days4 days3 1/2days2 days
A, B and C can do a piece of work in 20, 30 and 40 days, respectively. A and C started the work and B joined 4 days later. A left 8 days before the completion of work and C was also absent for 5 days in between. How many days will it take for the work to be completed?
Select the correct answerA, B and C can do a piece of work in 30 days, 45 days and 90 days, respectively. A starts the work and he is assisted by B and C together on every third day. In how many days will the work be completed?Options24233022
A can do a work in 15 days and B in 20 days. In how many days will they work together to finish the work
A, B and C can do a work in 20 days, 24 days and 30 days respectively. A and B left the work 4 days before completion of the work, then whole work will finish in how many days?Options10 14/1511 8/159 2/312 7/15