In a Control Chart, if a data point goes beyond the upper and lower control limits, the process is called?
Question
In a Control Chart, if a data point goes beyond the upper and lower control limits, the process is called?
Solution
The process is called "Out of Control" when a data point goes beyond the upper and lower control limits in a Control Chart. This indicates that the process is not stable and there are some special causes that are affecting the process.
Similar Questions
A control chart of any type answers the question, “is my process in control?”Group startsTrue or False
The process control charts are used:a.to determine the acceptability of the sameb.to detect the problemc.to reject the problemd.to graph what typically focuses on the prevention of a problem
The following figure shows the X chart for a set of data.Identify whether the following statement is true or false.The process represented in the graph is under control.Group of answer choicesTrueFalse
Data was collected from a process under statistical control for developing R-Chart. The collected data is presented in Table 1 below:Table 1: Mass of containersSubgroup Mass of containers (gm)Container 1 Container 2 Container 3 Container 41 601 599 603 6012 602 600 598 6003 599 597 601 5994 601 596 600 5995 599 600 598 602The control chart factors are given in the table below:REQUIRED:Determine the value of Upper Control Limit (UCL) (in gm) for the R-Chart.
If properties are allowed to change within the control volume, the processes are called ______ flow.