Through site visits and consultations with construction companies, information about the two locations’ land area, accessibility, impact on residents, completion period and building cost _____ gathered.Question 7Select one:a.will beb.should bec.hasd.was

Question

Through site visits and consultations with construction companies, information about the two locations’ land area, accessibility, impact on residents, completion period and building cost _____ gathered.Question 7Select one:a.will beb.should bec.hasd.was

🧐 Not the exact question you are looking for?Go ask a question

Solution

The correct answer is d. was. The sentence is in the past tense, so "was gathered" is the correct choice.

Similar Questions

QUESTION 2A property survey will not  a. locate and reestablish boundaries of land parcels b. determine the area of land enclosed within boundaries c. determine the positions of buildings, driveways, fences, and other facilities d. be used as an elevation benchmark

1. Critically analyse, synthesise and review literature in a discipline area.2. Discuss a range of research methodologies, and review tools and techniques for data collection.3. Review data analysis techniques and their application in construction research.4. Evaluate contemporary research findings relevant to the built environment.

Is the outline and measurements of the proposed building and its placement on the property

Which site-specific information should be gathered prior to a site survey?  Each correct answer represents a complete solution. Choose three.  This type of question contains radio buttons and checkboxes for selection of options. Use Tab for navigation and Enter or space to select the option.Aoption ABlueprints Boption BFloor plansCoption CElectrical specificationsDoption DLocation of furnishing

What factor might influence the cost of variations due to changes in construction projects?*A. The availability of materials and resourcesB. The project's geographical locationC. The builder's previous experienceD. The number of project stakeholders involved