[iv] A construction worker holds a heavy tool box in his hands for 2hour. How much work is done by the worker in those two hour? [a] mgh [b] ½ mv2 [c] zero [d] none of the above.
Question
[iv] A construction worker holds a heavy tool box in his hands for 2hour. How much work is done by the worker in those two hour? [a] mgh [b] ½ mv2 [c] zero [d] none of the above.
Solution
To determine the amount of work done by the construction worker, we need to consider the definition of work. Work is defined as the product of force and displacement in the direction of the force. In this case, the construction worker is holding a heavy tool box in his hands, which means he is exerting a force against the gravitational force acting on the tool box.
The correct formula to calculate the work done in this situation is given by the equation W = mgh, where W represents work, m represents the mass of the tool box, g represents the acceleration due to gravity, and h represents the height at which the tool box is held.
Since the question does not provide any information about the height at which the tool box is held, we cannot calculate the exact value of work done. However, we can conclude that the work done is not zero or none of the above, as the construction worker is exerting a force against gravity to hold the tool box.
Therefore, the correct answer is [a] mgh.
Similar Questions
A weightlifter lifts a weight of 500N from the ground over her head, a distance of 1.8m. How much work has been done to move the weight?
A front liner holds a COVID-19 vaccine transport box over his head at a height of 3.2 m from the ground. The box has a weight of 253N. How much work is being done in holding the box in this elevated position?
A large stone is rolled onto a lorry using a ramp.*1 pointThe length of the ramp is l. The stone is lifted a height of h.The mass of the stone is m. The weight of the stone is W.Which expression is equal to the useful work done on the stone?
A sled is dragged along a horizontal path at a constant speed of v𝑣 = 1.56 m/s by a rope that is inclined at an angle of θ𝜃 = 31.5° with respect to the horizontal (as shown in the figure below). The total weight of the sled is 488 N. The tension in the rope is 244 N. How much work is done by the rope on the sled in a time interval of 11.2 s?
Power = 400 WTime = 2.5 minutesCalculate the work done.Work done = _____ kJ
Upgrade your grade with Knowee
Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.