The road development authority of Sri lanka is proposing to develop a new expressway from kottawa to Rathanapura. RDA has commissioned an EIA to assess the potential environmental impacts of the project and to propose mitifation measures to minimize or offset any adverse effects. Identify five project activities during the pre construction phase and construction phase and three project activities during the post construction phase.

Question

The road development authority of Sri lanka is proposing to develop a new expressway from kottawa to Rathanapura. RDA has commissioned an EIA to assess the potential environmental impacts of the project and to propose mitifation measures to minimize or offset any adverse effects. Identify five project activities during the pre construction phase and construction phase and three project activities during the post construction phase.

...expand
🧐 Not the exact question you are looking for?Go ask a question

Solution

Pre-construction Phase:

  1. Land Surveying: This involves the examination and measurement of the land where the expressway will be built. This is to ensure that the land is suitable for construction.
  2. Designing: This involves creating a detailed plan of the expressway, including the number of lanes, the location of exits and entrances, and other important features.
  3. Obtaining Permits: Before construction can begin, the RDA must obtain all necessary permits and approvals from local and national authorities.
  4. Clearing and Excavation: This involves the removal of trees, vegetation, and other obstacles from the construction site. It also involves the excavation of the land to prepare it for construction.
  5. Setting up Construction Site: This involves setting up all necessary facilities and equipment at the construction site, including temporary offices, storage areas, and worker accommodations.

Construction Phase:

  1. Earthworks: This involves the movement and placement of large amounts of soil and rock to create the foundation for the expressway.
  2. Paving: This involves the laying of asphalt or concrete to create the road surface.
  3. Building Bridges and Overpasses: If the expressway crosses rivers or other roads, bridges and overpasses will need to be built.
  4. Installing Signage and Lighting: This involves the installation of road signs, traffic lights, and street lights.
  5. Landscaping: This involves the planting of trees and other vegetation along the expressway to improve its appearance and to provide a barrier against noise and wind.

Post-construction Phase:

  1. Road Testing: This involves testing the expressway to ensure that it is safe for use. This may include driving vehicles on the road, checking the signage and lighting, and inspecting the road surface for defects.
  2. Maintenance: This involves regular checks and repairs to ensure that the expressway remains in good condition. This may include filling potholes, replacing damaged signs, and cleaning drainage systems.
  3. Monitoring Environmental Impact: This involves monitoring the expressway to assess its impact on the environment. This may include checking air and water quality, monitoring noise levels, and observing the health of vegetation and wildlife in the area.

This problem has been solved

Similar Questions

Define Environmental Impact Assessment and discuss on types, time frame and budget ofEIA with reference to Nepal. Why do you carry out EIA before the detailed design work

The  Environmental Impact Assessment (EIA) Athuority is to responsible to Options :Assessing the potential environmental impacts of a project before developmentAssessing the potential environmental impacts of a project after developmentAssessing the potential environmental impacts of a project during the developmentBoth a and b

EIA is defined asAnswer :A. A process of identifying, predicting, and evaluating the likely impacts of a proposed project or development to define mitigation actions to reduce negative impacts and to provide positive contributions to the natural environment and well-beingB. A report written by government representatives on the planned development impacts of environment, socio-economic issues and culture C. Project life-cycle assessmentD. Ecosystem life-cycle process

EIA is necessary because …………a) development is bad for the environmentb) there is growing interest in sustainabilityc) environmental impacts of developments are of public interestd) none of the above

What is essential in an EIA?Answer :A. That it allows decision makers to assess a project’s impacts in all its phasesB. That it allows the public and other stakeholders to present their views and inputs on the planned developmentC. That it contributes to and improve the project design, so that environmental as well as socioeconomic measures are core parts of itD. All above