Job 910 was recently completed. The following data have been recorded on its job cost sheet:Direct materials $ 2,429 Direct labor-hours 74 labor-hoursDirect labor wage rate $ 17 per labor-hourMachine-hours 135 machine-hoursThe Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is $18 per machine-hour. The total cost that would be recorded on the job cost sheet for Job 910 would be:Multiple Choice$6,957$3,441$3,687$6,117
Question
Job 910 was recently completed. The following data have been recorded on its job cost sheet:Direct materials 17 per labor-hourMachine-hours 135 machine-hoursThe Corporation applies manufacturing overhead on the basis of machine-hours. The predetermined overhead rate is 6,9573,687$6,117
Solution
To calculate the total cost recorded on the job cost sheet for Job 910, we need to add up the costs of direct materials, direct labor, and manufacturing overhead.
-
Direct materials cost is given as $2,429.
-
Direct labor cost can be calculated by multiplying the direct labor hours by the direct labor wage rate. So, 74 labor-hours * 1,258.
-
Manufacturing overhead cost is calculated by multiplying the machine hours by the predetermined overhead rate. So, 135 machine-hours * 2,430.
Now, add up all these costs: 1,258 (direct labor) + 6,117.
So, the total cost that would be recorded on the job cost sheet for Job 910 is $6,117.
Similar Questions
Use the following information to answer the next question:Estimated manufacturing overhead$520,000Estimated machine hours16,000Actual machine hours worked15,000Actual overhead costs incurred: Indirect materials$180,000 Indirect labour$135,000 Utilities$ 40,000 Insurance$ 20,000 Rent$150,000If the company uses a predetermined overhead rate to apply overhead, manufacturing overhead applied would be:Question 2Select one:a.$487,500b.$520,000c.$525,000d.$554,667
Estimated manufacturing overhead$450,000Estimated direct labor hours150,000Actual manufacturing overhead$405,000Actual direct labor hours180,000 Based on this information, the predetermined overhead rate per direct labor hour is $. (Enter your answer as a whole number.)
Multiple Choice Question Estimated manufacturing overhead$500,000Estimated direct labor cost$250,000Actual manufacturing overhead$720,000Actual direct labor cost$300,000 Based on this information, the predetermined overhead rate per direct labor dollar is:Multiple choice question.$2.88$2.00$1.67 $2.40
Question 1Job No.909 was completed in three departments of a factory. Costs details for this job were:Department Direct materials (RM) Direct wages(RM) Direct labour hoursX 650 800 1,000Y 940 300 400Z 230 665 700The production overheads are absorbed into the jobs using predetermined departmental overhead absorption rates based on the direct labour hours. The administrative overhead is absorbed as a percentage of production cost.The figures for the last cost period for the three departments on which the current overhead recovery rates are base were as follows:Department X Y ZDirect materials (RM) 6,125 11,360 25,780Direct wages (RM) 9,375 23,400 54,400Direct labour hours 12,500 36,000 64,000Production overheads (RM) 5,000 7,200 9,600Administrative overheads (RM) 2,870 14,686 8,978Required:Prepare a cost card showing the cost of Job No.909 and to show the price charged, assuming a profit margin of 20%.
Job #608 used 300 direct labor hours at a rate of $30 per hour. The company applies manufacturing overhead at a rate of 150% of direct labor costs. Calculate the total direct labor cost and the total manufacturing overhead applied to Job #608.Question 15Answera.Direct labour cost: $9,000, Manufacturing overhead: $12,000b.Direct labour cost: $9,000, Manufacturing overhead: $13,500c.Direct labor cost: $10,000, Manufacturing overhead: $13,500d.Direct labor cost: $10,000, Manufacturing overhead: $12,000