Carrie is installing tiles in the entrance of her neighbor's home. The room is 4.4 ' by 8 'The porcelain tiles are 7" by 7" and cost $4.50 each. Her labor charge is $150.  What is the closest estimate to the cost of this job?a.615.50b.635.50c.153.23d.595.50

Question

Carrie is installing tiles in the entrance of her neighbor's home. The room is 4.4 ' by 8 'The porcelain tiles are 7" by 7" and cost 4.50each.Herlaborchargeis4.50 each. Her labor charge is 150.  What is the closest estimate to the cost of this job?a.615.50b.635.50c.153.23d.595.50

🧐 Not the exact question you are looking for?Go ask a question

Solution

First, we need to calculate how many tiles Carrie will need.

The area of the room is 4.4 feet by 8 feet, which is 35.2 square feet.

The area of each tile is 7 inches by 7 inches. To convert this to feet (since the room measurements are in feet), we remember that 1 foot is 12 inches. So, each tile is 7/12 feet by 7/12 feet, which is approximately 0.3403 square feet.

To find out how many tiles are needed, we divide the total area of the room by the area of each tile: 35.2 / 0.3403 = approximately 103 tiles.

Since each tile costs 4.50,thetotalcostforthetilesis1034.50, the total cost for the tiles is 103 * 4.50 = $463.50.

Adding the labor charge of 150,thetotalcostofthejobis150, the total cost of the job is 463.50 + 150=150 = 613.50.

So, the closest estimate to the cost of this job is $615.50 (option a).

This problem has been solved

Similar Questions

Mr. Raj wishes to lay decorative tiles for his rectangular study room floor. The cost of laying the tiles is Rs. C / Sq. m. Find the total cost Rs. T of laying the tiles. The contractor offers a discount of Rs. D % for the work if T is greater than or equal to Rs. M. (i.e. minimum cost value to get discount).Find the total cost after the discount if any.Note: Area of the rectangular room = length *breadthInput FormatRead the length of the room (Integer)Read the breadth of the room (Integer)Read the cost of laying the sheet per square meter (Integer)Read the minimum cost value to get a discount (Integer)Read the discount percentage (Float)Output FormatArea of the room (Integer)Total cost of the work (Float)You are eligible for discount/ You are not eligible for discountDiscount amount on the total cost (Float)Total cost to be paid (Float)

How much will it cost for the tiles on the walls and floor of a 3 m-high, 12 m-by-16 m-squared room? The room has one door and two windows.Statement A: The price of a square meter of tiles is 20 rupees.Statement B: The size of the tile is 1.5m by 1.5mStatement C: Each window has a 6 square meter surface area, which is 40% of the door’s surface area.aOnly statement A is sufficient to answer the question.bStatements A and B are sufficient to answer the question.cStatements A and C are sufficient to answer the question.dStatements A, B, and C are sufficient to answer the question.

A company produces batches of 1,500 units. Each batch requires 60 machine hours. The overhead is applied at a rate of $30 per machine hour. If the direct materials cost $3,000 and the direct labor costs $2,700 per batch, what is the total cost of the batch and the cost per unit?Question 17Answera.Total cost: $7,500, Cost per unit: $5b.Total cost: $7,200, Cost per unit: $4.80c.Total cost: $6,000, Cost per unit: $4d.Total cost: $6,500, Cost per unit: $4.33

Matt is writing an estimate for a client who would like to have a patio built from interlocking blocks. The landscaper has provided two designs that would fit in the yard:Plan 1 is for a patio 3 yards long and 4 yards wide.Plan 2 is for a patio 5 yards long and 2.5 yards wide.The client wants to know how much each plan will cost. Matt will use rectangular bricks that measure 8" by 4" and cost $5.00 a square foot. Matt's labor charge is $8.50 per square foot.1) What is the total cost of plan 2?(Enter your dollars and cents with no dollar symbol.)2) Which plan is the least expensive? Enter plan 1 or plan 2

Janitor Supply produces an industrial cleaning powder that requires 50 grams of material at $0.40 per gram and 0.15 direct labor hours at $14.00 per hour. Overhead is applied at the rate of $18 per direct labor hour. What is the total standard cost for one unit of product that would appear on a standard cost card?Multiple Choice$22.10.$22.70.$35.00.$4.80.$24.80.

1/3

Upgrade your grade with Knowee

Get personalized homework help. Review tough concepts in more detail, or go deeper into your topic by exploring other relevant questions.